Skip to content
Monday – Friday: 7:30 a.m. – 4:30 p.m. · Saturday: By appointment · Sunday: ClosedMonday – Friday: 7:30 a.m. – 4:30 p.m.Veteran ownedLead-Safe Certified Firm (RRP) · TX Firm cert. no. 000000VerifyGeneral liability insurance
1 more license
  • Lead-Safe Certified Firm (RRP) · TX Firm cert. no. 000000Verify
  • General liability insurance

Ramps and entries

A step-free way into the house

Front, side or garage door: we measure the rise, work out the run and build a ramp or a no-step entry you can use on a July afternoon.

A ramp is a long shape. We build to 1 inch of rise for every 12 inches of run, so a 24-inch step takes 24 feet of ramp, plus a flat landing at the top, at every turn and at the bottom. We draw it on a photo of your yard before you choose a material.

Not in the usual scope: driveway paving, tree removal and engineered drawings. When a job needs one of them it gets its own line in the estimate.

What's included

  • Wood, concrete or aluminum, whichever fits your lot

  • Landings and turns drawn to scale

  • Handrails 34 to 38 inches high on both sides

  • Non-slip surface and edge guards

  • Step-free entries that replace one or two steps

  • A level threshold at the door

A one-story ranch house with a covered porch, lit from inside at dusk

What changes the cost

Four things that set the price of a ramp

We name each one in the estimate. No figures here: they depend on your door and your yard.

  • Height of the door

    Every inch of rise adds a foot of ramp.

  • The material

    Aluminum goes up fast and can move with you. Concrete lasts. Wood sits in between.

  • The yard

    Slope, trees, meters, setbacks and where the car parks.

  • Permits and reviews

    The city, your HOA and, on a grant job, VA's agent.

How it goes

How a ramp job goes

  1. 01

    Step 1: Site walk

    We measure the rise, the door and the space for landings, and photograph the yard.

  2. 02

    Step 2: Drawing

    A sketch on your photo shows the run, the turns and the rails.

  3. 03

    Step 3: Estimate

    In writing, with the material choices side by side.

  4. 04

    Step 4: Approvals

    Permit, HOA drawing and, if VA is paying, the agent's review.

  5. 05

    Step 5: Build

    Footings, frame, deck and rails. Concrete needs time to cure, and we tell you the day you can use it.

Permits and rules

Who pulls the permit, and what else has to say yes

Many ramps need a permit from the City of San Antonio. We check for your address, pull the permit when one is needed and put its cost on its own line.

In a historic district such as King William or Monte Vista, exterior changes go to the city's historic preservation office first, and we build that step into the schedule. If you have an HOA, we send them the drawing before we order anything.

Questions

Common questions

How long does my ramp have to be?

Plan on 12 inches of ramp for each inch of rise. We measure your door on the site walk and give you the number before you choose a material.

Does a metal ramp get too hot?

In a San Antonio summer, bare aluminum and dark rails can burn a hand. We texture the surface, choose lighter finishes and show you shade options.

Can a VA grant pay for a ramp?

SAH, SHA and HISA can fund adaptations like ramps. VA decides what it approves in your case; your VSO can help you ask.

Can the ramp be taken out later?

Aluminum ramps unbolt and can be moved or sold. Wood and concrete ramps come out in a day or two and the steps can go back.

Standing at the door with a tape measure?

Text us the number from the ground to the door sill and a photo of the yard. We'll tell you how long the ramp has to be.